10.0 Change of use
Closed16 Oct, 2021, 08:00 - 29 Nov, 2021, 17:00
10.0 Change of use
Where a proposed change of use does not lead to the need for new or upgraded infrastructure/services or a significant intensification of demand placed on existing infrastructure, the development shall be exempt from paying a contribution.
In all other circumstances, the change of use shall be charged at the rate appropriate to the new use, subject to a reduction in respect of the contribution rate appropriate to the existing usage.