Level 4 - Settlements Zoning and Development Objectives

Dúnta12 Már, 2022, 8:00am - 11 Aib, 2022, 5:00pm

-Level 4 – Settlements Zoning and Development Objectives

 

MA

No.

 

Level 4 - Settlements Zoning and Development Objectives - Material Alterations

 

Section/ Policy/ Objective etc.

Submission No.s/ Elected Member Amendment No.

158

Amend Level 4 Large Villages Overall Objective SE O3 - Expansion of Services and Infrastructure as follows:

 

It is an objective of the Council to facilitate the provision and expansion of all services and infrastructure where required, to realise the development objectives of this Plan and which would contribute positively to the attraction of the settlements for development.

 

Volume 2 Level 4

 

Large Villages – Overall Objectives

 

SE O3 Expansion of Services and Infrastructure

205

159

Amend Ballingarry Zoning Map as follows (refer to end of this section for map):

 

Include an area of 3.08ha. for Serviced Sites.

 

Volume 2 Level 4

 

Ballingarry Zoning Map

76

 

25 - Cllr. John O’Donoghue

 

24 - Cllr. Stephen Keary

160

Amend Bruff Zoning Map as follows (refer to end of this section for map):

 

Change an area of 0.2ha. from Open Space and Recreation to New Residential.

 

Volume 2 Level 4

 

Bruff Zoning Map

59

 

14 - Cllr. Gerald Mitchell

161

Amend Cappamore Zoning Map as follows (refer to end of this section for map):


Remove Site No. 2 (0.152ha.) and realign the boundary to reflect existing residential on the ground.

Volume 2 Level 4

 

Cappamore Zoning Map

50 - Cllr. John Egan, Cllr. Martin Ryan

162

Amend Cappamore Zoning Map as follows (refer to end of this section for map):

 

Change the Zoning of sites No.5 and No.6 to from Serviced Sites to New Residential.

Volume 2 Level 4

 

Cappamore Zoning Map

 

50 - Cllr. John Egan, Cllr. Martin Ryan

163

Amend Cappamore Zoning Map as follows (refer to end of this section for map):

 

Include an area of 0.65 ha. for Enterprise and Employment.

Volume 2 Level 4

 

Cappamore Zoning Map

 

278

 

50 - Cllr. John Egan, Cllr. Martin Ryan

164

Amend Cappamore Zoning Map as follows (refer to end of this section for map):

 

Include an area of 0.66ha. for Serviced Sites.

 

Volume 2 Level 4

 

Cappamore Zoning Map

 

278

 

50 - Cllr. John Egan, Cllr. Martin Ryan

165

Amend Doon Zoning Map as follows (refer to end of this section for map):

 

Change the Zoning of 1.762ha. From New Residential to Community and Education.

 

Volume 2 Level 4

 

Doon Zoning Map

 

263

 

51 - Cllr. Martin Ryan

166

Amend Doon Zoning Map as follows (refer to end of this section for map):

 

Include an area of 1.73ha. for New Residential.

 

Volume 2 Level 4

 

Doon Zoning Map

 

263

 

51 - Cllr. Martin Ryan

 

167

Amend Foynes Objective FO O1 Capacity of National Roads to include the following:

 

b)  All development proposals within the ‘Marine Related Industry’ land use zoning will be  subject to a Traffic and Transport Assessment and Road Safety Audit in accordance with Chapter 3 of the DoECLG Spatial Planning and National Roads Guidelines at planning application stage.

 

Volume 2 Level 4

 

Foynes Settlement Objectives

 

FO O1 Capacity of National Roads

70

168

Insert a new Foynes Objective FO OXX Infrastructure Upgrades as follows:

 

Objective FO OXX Infrastructure Upgrades ‐ It is the objective of the Council to support the provision of water and wastewater infrastructure to realise the development objectives of this Plan.

 

Volume 2 Level 4

 

Foynes Settlement Objectives

 

New objective

205

169

Amend Foynes Zoning Map as follows (refer to end of this section for map):

 

Change an area of 1ha. of land from Agriculture to New Residential at Corgring Wood.

 

Volume 2 Level 4

 

Foynes Zoning Map

23

170

Include a new Glin Objective GL 08 Mixed Use Zoned Land as follows:

 

Objective GL O8 - Mixed Use Zoned Land - The purpose of this zoning is to facilitate a variety of uses that would support the further development of the village, including residential, health care, hotel and tourism related activities. Notwithstanding the land-use zoning objective and purpose set out in section 12.3, volume 1 and the land use zoning matrix, in order to protect the village centre, retail uses that could more appropriately be located in the village centre and or compete with existing uses in the village centre will not be permitted on this land.

 

Volume 2 Level 4

 

Glin

240

 

47 - Cllr. John Sheahan

171

Amend Glin Zoning Map as follows (refer to end of this section for map):

 

Change an area of 1.6ha. of land from New Residential to Mixed Use.

 

Volume 2 Level 4

 

Glin Zoning Map

240

 

47 - Cllr. John Sheahan

172

Amend Glin Zoning Map as follows (refer to end of this section for map):

 

Include an area of 1.2ha. of land for New Residential zoning.

 

Volume 2 Level 4

 

Glin Zoning Map

259

 

48 - Cllr. John Sheahan

173

Amend Hospital text under Infrastructure as follows:

 

The Waste Water Treatment Plant in the village has issues in relation to capacity and has been identified as being overloaded. Minor upgrade works are planned, which will improve quality in the outfall, however these works will not increase capacity. The Council have identified Hospital for upgrade works on the Small Towns and Villages Programme, administered under Irish Water, which could be delivered within the lifetime of the Plan. Hospital was successful in securing funding under the Small Towns and Villages Scheme and the Wastewater treatment plant, will be upgraded within the lifetime of the Plan.

 

Volume 2 Level 4

 

Hospital

 

Infrastructure

205

174

Insert a new Hospital Objective HO OXX Significant Development as follows:

 

Objective HO OXX Significant Development - No significant development shall take place within the settlement, until such time as an adequate wastewater treatment system is in place.

 

Volume 2 Level 4

 

Hospital Settlement Objectives

 

New objective

205, 225

175

Insert a new Murroe Objective MU OXX Significant Development as follows:

 

Objective MU OXX Significant Development - No significant development shall take place within the settlement, until such time as an adequate wastewater treatment system is in place.

 

Volume 2 Level 4

 

Murroe Settlement

Objective

 

New objective

205, 225

176

Amend Pallaskenry text under Infrastructure as follows:

 

In terms of sewerage the existing plant has adequate capacity, to cater for the projected growth in the lifetime of the plan. Water is supplied from the Foynes/Shannon Estuary Water Treatment Plant. Spare capacity exists in the separated surface water network and discharges to the lake at the rear of Cluan Mhuire Estate. There is very limited capacity available in the Shannon Estuary Water Resource Zone (WRZ), this is insufficient to cater for projected growth across the WRZ. A proposed solution is to connect to the Limerick City Public Water Scheme (PWS), however this is not included in 2020-2024 current Investment Plan.

 

Volume 2 Level 4

 

Pallaskenry

 

Infrastructure

205

177

Amend Pallasgreen text under Community and Recreation reference as follows:

 

Pallasgreen and Templebradon Development Association Pallasgreen/Templebraden Community Council

 

Volume 2 Level 4

 

Pallasgreen

 

 

173

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Volume 2 Level 4 Settlement Capacity Audit: Ballingarry

Ballingarry

 

Site No.

 

Zoning

 

Area (ha)

 

Assumed Residential Density per ha.

 

Lighting

 

Footpaths

 

Public Transport

 

Road Access

 

Water

 

Foul

 

Surface Water

 

Flood Risk

 

Infill/

Brown-field

 

Time Line / Cost

 

Comments if applicable

 

 

Service Status/ Tier

1

New  Residential

1.75

22  units

/ha

ü

ü

!

ü

ü

ü

ü

û

ü

N/A

 

1

2

Residential Serviced Sites

1.057

10  units

/ha

!

!

!

ü

ü

ü

ü

û

ü

N/A

 

1

3

Residential Serviced Sites

2.903

10 units/ha

ü

ü

!

ü

ü

ü

!

û

û

N/A

 

1

 

Legend

Serviced/ Yes

ü

Serviceable/ Investment required

!

Not required/ No

û

Short term – 1 - 2 year delivery

S

Medium term – 3 – 5 year delivery

M

Long Term – beyond lifetime of the Plan delivery

L

 

 

 

 

 

 

 

 

 

 

Volume 2 Level 4 Settlement Capacity Audit: Bruff

Bruff

 

Site No.

 

Zoning

 

Area (ha)

 

Assumed Residential Density per ha.

 

Lighting

 

Footpaths

 

Public Transport

 

Road Access

 

Water

 

Foul

 

Surface Water

 

Flood Risk

 

Infill/

Brown-field

 

Time Line / Cost

 

Comments if applicable

 

 

Service Status/ Tier

1.

New Residential

3.277

22  units

/ha

ü

ü

ü

ü

ü

ü

ü

û

û

N/A

Permission for 55 units

Partial distributor road required as part of planning application 16/1184

1

2.

New Residential

0.679

22

units/ha

ü

ü

ü

ü

ü

ü

ü

û

û

N/A

Part 8 Application for 20 No. units

1

3.

Residential Serviced Sites

1.411

            

10 units /ha

ü

ü

ü

ü

ü

ü

ü

û

û

N/A

Permission for 9 serviced sites

1

4

New Residential

0.234

22 units/ha

ü

ü

ü

ü

ü

ü

ü

!

û

N/A

Most of site is outside Area of flood risk identified in Strategic Flood Risk Assessment.

1

 

 

 

 

 

 

Volume 2 Level 4 Settlement Capacity Audit: Cappamore

Cappamore

 

Site No.

 

Zoning

 

Area

(ha)

 

Assumed Residential Density per ha.

 

Lighting

 

Footpaths

 

Public Transport

 

Road Access

 

Water

 

Foul

 

Surface Water

 

Flood Risk

 

Infill/

Brown-field

 

Time Line / Cost

 

Comments if applicable

 

 

Service Status/ Tier

1

New Residential

1.327

22  units

/ha

ü

ü

ü

ü

ü

ü

ü

û

û

 

Committed Local Authority Development

1

2

New Residential

0.512

22  units

/ha

ü

ü

ü

ü

ü

ü

ü

û

ü

 

 

1

  2

Serviced sites

0.66

10 units/ha

ü

ü

ü

ü

ü

ü

ü

û

ü

 

 

1

3

New Residential

1.012

22  units

/ha

ü

ü

ü

ü

ü

ü

ü

û

ü

S/M

Extant permission for Nursing Home 16/254

1

4

New Residential

0.289

22 units /ha

ü

ü

ü

ü

ü

ü

ü

û

ü

S/M

Extant permission for Elderly person Accommodation 19/872

1

5

New Residential

Residential Serviced Sites

0.18

22 units /ha

10 units/ha

ü

ü

ü

ü

ü

ü

ü

û

ü

 

 

1

6

New Residential

Residential Serviced Sites

0.116

22 units /ha

10 units/ha

ü

ü

ü

ü

ü

ü

ü

û

ü

 

 

1

 

 

Legend

Serviced/ Yes

ü

Serviceable/ Investment required

!

Not required/ No

û

Short term – 1 - 2 year delivery

S

Medium term – 3 – 5 year delivery

M

Long Term – beyond lifetime of the Plan delivery

L

 

 

 

 

 

Volume 2 Level 4 Settlement Capacity Audit: Doon

Doon

 

Site No.

 

Zoning

 

Area

(ha)

 

Assumed Residential Density per ha.

 

Lighting

 

Footpaths

 

Public Transport

 

Road Access

 

Water

 

Foul

 

Surface Water

 

Flood Risk

 

Infill/

Brown-field

 

Time Line / Cost

 

Comments if applicable

 

 

Service Status/ Tier

1

New Residential

1.73

22  units

/ha

ü

ü

ü

ü

!

ü

!

û

û

 

 

1

1

New Residential

1.73

22 units/ha

ü

ü

ü

ü

!

ü

!

û

ü

 

Permission granted for 25 units 16530

1

2

Residential Service Sites

0.967

10 units /ha

ü

ü

ü

ü

!

ü

!

û

ü

 

 

1

 

 

Legend

Serviced/ Yes

ü

Serviceable/ Investment required

!

Not required/ No

û

Short term – 1 - 2 year delivery

S

Medium term – 3 – 5 year delivery

M

Long Term – beyond lifetime of the Plan delivery

L

 

 

 

 

 

 

 

 

 

Volume 2 Level 4 Settlement Capacity Audit: Foynes

Foynes

 

Site No.

 

Zoning

 

Area (ha)

 

Assumed Residential Density per ha.

 

Lighting

 

Footpaths

 

Public Transport

 

Road Access

 

Water

 

Foul

 

Surface Water

 

Flood Risk

 

Infill/

Brown-field

 

Time Line / Cost

 

Comments if applicable

 

 

Service Status/ Tier

1

New Residential & Serviced Sites

2.489

3.498

10-22 units

/ha

!

!

ü

ü

!

!

ü

û

û

N/A

Site to provide for a mix of Serviced Sites and New Residential.

 

1

 

 

Legend

Serviced/ Yes

ü

Serviceable/ Investment required

!

Not required/ No

û

Short term – 1 - 2 year delivery

S

Medium term – 3 – 5 year delivery

M

Long Term – beyond lifetime of the Plan delivery

L

 

 

 

 

 

 

 

Volume 2 Level 4 Settlement Capacity Audit: Glin

Glin

 

Site No.

 

Zoning

 

Area (ha)

Assumed Residential Density per ha.

 

Lighting

 

Footpaths

 

Public Transport

 

Road Access

 

Water

 

Foul

 

Surface Water

 

Flood Risk

 

Infill/

Brown-field

 

Time Line / Cost

 

Comments if applicable

 

 

Service Status/ Tier

1

 

1

New Residential

Mixed Use

1.613

 

 22 units

/ha

20% at 22/ha

ü

!

ü

ü

ü

!

ü

û

ü

N/A

 

1

1

2

New Residential

0.527

22 units

/ha

ü

ü

ü

ü

ü

!

ü

û

û

N/A

 

1

3

Serviced Sites

0.965

10 units

/ha

ü

ü

ü

ü

ü

!

ü

û

û

N/A

 

1

4

New Residential

1.25

22 units/ha

ü

ü

ü

ü

ü

!

ü

û

ü

N/A

Extant permission for 15 units

07/601 and 13/7045

1

                                 

 

 

 

 

Cappamore
This submission seeks a minor modification to the zoning matrix for Enterprise and Employment uses to include residential use as a permitted in principle use, particularly in relation to...