Level 4 - Settlements Zoning and Development Objectives
-Level 4 – Settlements Zoning and Development Objectives
MA No. |
Level 4 - Settlements Zoning and Development Objectives - Material Alterations
|
Section/ Policy/ Objective etc. |
Submission No.s/ Elected Member Amendment No. |
158 |
Amend Level 4 Large Villages Overall Objective SE O3 - Expansion of Services and Infrastructure as follows:
It is an objective of the Council to facilitate the provision and expansion of all services and infrastructure where required, to realise the development objectives of this Plan and
|
Volume 2 Level 4
Large Villages – Overall Objectives
SE O3 Expansion of Services and Infrastructure |
205 |
159 |
Amend Ballingarry Zoning Map as follows (refer to end of this section for map):
Include an area of 3.08ha. for Serviced Sites.
|
Volume 2 Level 4
Ballingarry Zoning Map |
76
25 - Cllr. John O’Donoghue
24 - Cllr. Stephen Keary |
160 |
Amend Bruff Zoning Map as follows (refer to end of this section for map):
Change an area of 0.2ha. from Open Space and Recreation to New Residential.
|
Volume 2 Level 4
Bruff Zoning Map |
59
14 - Cllr. Gerald Mitchell |
161 |
Amend Cappamore Zoning Map as follows (refer to end of this section for map):
|
Volume 2 Level 4
Cappamore Zoning Map |
50 - Cllr. John Egan, Cllr. Martin Ryan |
162 |
Amend Cappamore Zoning Map as follows (refer to end of this section for map):
Change the Zoning of sites No.5 and No.6 to from Serviced Sites to New Residential. |
Volume 2 Level 4
Cappamore Zoning Map
|
50 - Cllr. John Egan, Cllr. Martin Ryan |
163 |
Amend Cappamore Zoning Map as follows (refer to end of this section for map):
Include an area of 0.65 ha. for Enterprise and Employment. |
Volume 2 Level 4
Cappamore Zoning Map
|
278
50 - Cllr. John Egan, Cllr. Martin Ryan |
164 |
Amend Cappamore Zoning Map as follows (refer to end of this section for map):
Include an area of 0.66ha. for Serviced Sites.
|
Volume 2 Level 4
Cappamore Zoning Map
|
278
50 - Cllr. John Egan, Cllr. Martin Ryan |
165 |
Amend Doon Zoning Map as follows (refer to end of this section for map):
Change the Zoning of 1.762ha. From New Residential to Community and Education.
|
Volume 2 Level 4
Doon Zoning Map
|
263
51 - Cllr. Martin Ryan |
166 |
Amend Doon Zoning Map as follows (refer to end of this section for map):
Include an area of 1.73ha. for New Residential.
|
Volume 2 Level 4
Doon Zoning Map
|
263
51 - Cllr. Martin Ryan
|
167 |
Amend Foynes Objective FO O1 Capacity of National Roads to include the following:
b) All development proposals within the ‘Marine Related Industry’ land use zoning will be subject to a Traffic and Transport Assessment and Road Safety Audit in accordance with Chapter 3 of the DoECLG Spatial Planning and National Roads Guidelines at planning application stage.
|
Volume 2 Level 4
Foynes Settlement Objectives
FO O1 Capacity of National Roads |
70 |
168 |
Insert a new Foynes Objective FO OXX Infrastructure Upgrades as follows:
Objective FO OXX Infrastructure Upgrades ‐ It is the objective of the Council to support the provision of water and wastewater infrastructure to realise the development objectives of this Plan.
|
Volume 2 Level 4
Foynes Settlement Objectives
New objective |
205 |
169 |
Amend Foynes Zoning Map as follows (refer to end of this section for map):
Change an area of 1ha. of land from Agriculture to New Residential at Corgring Wood.
|
Volume 2 Level 4
Foynes Zoning Map |
23 |
170 |
Include a new Glin Objective GL 08 Mixed Use Zoned Land as follows:
Objective GL O8 - Mixed Use Zoned Land - The purpose of this zoning is to facilitate a variety of uses that would support the further development of the village, including residential, health care, hotel and tourism related activities. Notwithstanding the land-use zoning objective and purpose set out in section 12.3, volume 1 and the land use zoning matrix, in order to protect the village centre, retail uses that could more appropriately be located in the village centre and or compete with existing uses in the village centre will not be permitted on this land.
|
Volume 2 Level 4
Glin |
240
47 - Cllr. John Sheahan |
171 |
Amend Glin Zoning Map as follows (refer to end of this section for map):
Change an area of 1.6ha. of land from New Residential to Mixed Use.
|
Volume 2 Level 4
Glin Zoning Map |
240
47 - Cllr. John Sheahan |
172 |
Amend Glin Zoning Map as follows (refer to end of this section for map):
Include an area of 1.2ha. of land for New Residential zoning.
|
Volume 2 Level 4
Glin Zoning Map |
259
48 - Cllr. John Sheahan |
173 |
Amend Hospital text under Infrastructure as follows:
The Waste Water Treatment Plant in the village has issues in relation to capacity and has been identified as being overloaded. Minor upgrade works are planned, which will improve quality in the outfall, however these works will not increase capacity.
|
Volume 2 Level 4
Hospital
Infrastructure |
205 |
174 |
Insert a new Hospital Objective HO OXX Significant Development as follows:
Objective HO OXX Significant Development - No significant development shall take place within the settlement, until such time as an adequate wastewater treatment system is in place.
|
Volume 2 Level 4
Hospital Settlement Objectives
New objective |
205, 225 |
175 |
Insert a new Murroe Objective MU OXX Significant Development as follows:
Objective MU OXX Significant Development - No significant development shall take place within the settlement, until such time as an adequate wastewater treatment system is in place.
|
Volume 2 Level 4
Murroe Settlement Objective
New objective |
205, 225 |
176 |
Amend Pallaskenry text under Infrastructure as follows:
In terms of sewerage the existing plant has adequate capacity, to cater for the projected growth in the lifetime of the plan. Water is supplied from the Foynes/Shannon Estuary Water Treatment Plant. Spare capacity exists in the separated surface water network and discharges to the lake at the rear of Cluan Mhuire Estate. There is very limited capacity available in the Shannon Estuary Water Resource Zone (WRZ), this is insufficient to cater for projected growth across the WRZ. A proposed solution is to connect to the Limerick City Public Water Scheme (PWS), however this is not included in 2020-2024 current Investment Plan.
|
Volume 2 Level 4
Pallaskenry
Infrastructure |
205 |
177 |
Amend Pallasgreen text under Community and Recreation reference as follows:
|
Volume 2 Level 4
Pallasgreen
|
173 |
Volume 2 Level 4 Settlement Capacity Audit: Ballingarry
Ballingarry |
|||||||||||||||
Site No. |
Zoning |
Area (ha) |
Assumed Residential Density per ha. |
Lighting |
Footpaths |
Public Transport |
Road Access |
Water |
Foul |
Surface Water |
Flood Risk |
Infill/ Brown-field |
Time Line / Cost |
Comments if applicable
|
Service Status/ Tier |
1 |
New Residential |
1.75 |
22 units /ha |
ü |
ü |
! |
ü |
ü |
ü |
ü |
û |
ü |
N/A |
|
1 |
2 |
Residential Serviced Sites |
1.057 |
10 units /ha |
! |
! |
! |
ü |
ü |
ü |
ü |
û |
ü |
N/A |
|
1 |
3 |
Residential Serviced Sites |
2.903 |
10 units/ha |
ü |
ü |
! |
ü |
ü |
ü |
! |
û |
û |
N/A |
|
1 |
Legend |
|||||
Serviced/ Yes |
ü |
Serviceable/ Investment required |
! |
Not required/ No |
û |
Short term – 1 - 2 year delivery |
S |
Medium term – 3 – 5 year delivery |
M |
Long Term – beyond lifetime of the Plan delivery |
L |
Volume 2 Level 4 Settlement Capacity Audit: Bruff
Bruff |
|||||||||||||||
Site No. |
Zoning |
Area (ha) |
Assumed Residential Density per ha. |
Lighting |
Footpaths |
Public Transport |
Road Access |
Water |
Foul |
Surface Water |
Flood Risk |
Infill/ Brown-field |
Time Line / Cost |
Comments if applicable
|
Service Status/ Tier |
1. |
New Residential |
3.277 |
22 units /ha |
ü |
ü |
ü |
ü |
ü |
ü |
ü |
û |
û |
N/A |
Permission for 55 units Partial distributor road required as part of planning application 16/1184 |
1 |
2. |
New Residential |
0.679 |
22 units/ha |
ü |
ü |
ü |
ü |
ü |
ü |
ü |
û |
û |
N/A |
Part 8 Application for 20 No. units |
1 |
3. |
Residential Serviced Sites |
1.411
|
10 units /ha |
ü |
ü |
ü |
ü |
ü |
ü |
ü |
û |
û |
N/A |
Permission for 9 serviced sites |
1 |
4 |
New Residential |
0.234 |
22 units/ha |
ü |
ü |
ü |
ü |
ü |
ü |
ü |
! |
û |
N/A |
Most of site is outside Area of flood risk identified in Strategic Flood Risk Assessment. |
1 |
Volume 2 Level 4 Settlement Capacity Audit: Cappamore
Cappamore |
|||||||||||||||
Site No. |
Zoning |
Area (ha) |
Assumed Residential Density per ha. |
Lighting |
Footpaths |
Public Transport |
Road Access |
Water |
Foul |
Surface Water |
Flood Risk |
Infill/ Brown-field |
Time Line / Cost |
Comments if applicable
|
Service Status/ Tier |
1 |
New Residential |
1.327 |
22 units /ha |
ü |
ü |
ü |
ü |
ü |
ü |
ü |
û |
û |
|
Committed Local Authority Development |
1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2 |
Serviced sites |
0.66 |
10 units/ha |
ü |
ü |
ü |
ü |
ü |
ü |
ü |
û |
ü |
|
|
1 |
3 |
New Residential |
1.012 |
22 units /ha |
ü |
ü |
ü |
ü |
ü |
ü |
ü |
û |
ü |
S/M |
Extant permission for Nursing Home 16/254 |
1 |
4 |
New Residential |
0.289 |
22 units /ha |
ü |
ü |
ü |
ü |
ü |
ü |
ü |
û |
ü |
S/M |
Extant permission for Elderly person Accommodation 19/872 |
1 |
5 |
New Residential
|
0.18 |
22 units /ha
|
ü |
ü |
ü |
ü |
ü |
ü |
ü |
û |
ü |
|
|
1 |
6 |
New Residential
|
0.116 |
22 units /ha
|
ü |
ü |
ü |
ü |
ü |
ü |
ü |
û |
ü |
|
|
1 |
Legend |
|||||
Serviced/ Yes |
ü |
Serviceable/ Investment required |
! |
Not required/ No |
û |
Short term – 1 - 2 year delivery |
S |
Medium term – 3 – 5 year delivery |
M |
Long Term – beyond lifetime of the Plan delivery |
L |
Volume 2 Level 4 Settlement Capacity Audit: Doon
Doon |
|||||||||||||||
Site No. |
Zoning |
Area (ha) |
Assumed Residential Density per ha. |
Lighting |
Footpaths |
Public Transport |
Road Access |
Water |
Foul |
Surface Water |
Flood Risk |
Infill/ Brown-field |
Time Line / Cost |
Comments if applicable
|
Service Status/ Tier |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1 |
New Residential |
1.73 |
22 units/ha |
ü |
ü |
ü |
ü |
! |
ü |
! |
û |
ü |
|
Permission granted for 25 units 16530 |
1 |
2 |
Residential Service Sites |
0.967 |
10 units /ha |
ü |
ü |
ü |
ü |
! |
ü |
! |
û |
ü |
|
|
1 |
Legend |
|||||
Serviced/ Yes |
ü |
Serviceable/ Investment required |
! |
Not required/ No |
û |
Short term – 1 - 2 year delivery |
S |
Medium term – 3 – 5 year delivery |
M |
Long Term – beyond lifetime of the Plan delivery |
L |
Volume 2 Level 4 Settlement Capacity Audit: Foynes
Foynes |
|||||||||||||||
Site No. |
Zoning |
Area (ha) |
Assumed Residential Density per ha. |
Lighting |
Footpaths |
Public Transport |
Road Access |
Water |
Foul |
Surface Water |
Flood Risk |
Infill/ Brown-field |
Time Line / Cost |
Comments if applicable
|
Service Status/ Tier |
1 |
New Residential & Serviced Sites |
3.498 |
10-22 units /ha |
! |
! |
ü |
ü |
! |
! |
ü |
û |
û |
N/A |
Site to provide for a mix of Serviced Sites and New Residential.
|
1 |
Legend |
|||||
Serviced/ Yes |
ü |
Serviceable/ Investment required |
! |
Not required/ No |
û |
Short term – 1 - 2 year delivery |
S |
Medium term – 3 – 5 year delivery |
M |
Long Term – beyond lifetime of the Plan delivery |
L |
Volume 2 Level 4 Settlement Capacity Audit: Glin
Glin |
||||||||||||||||
Site No. |
Zoning |
Area (ha) |
Assumed Residential Density per ha. |
Lighting |
Footpaths |
Public Transport |
Road Access |
Water |
Foul |
Surface Water |
Flood Risk |
Infill/ Brown-field |
Time Line / Cost |
Comments if applicable
|
Service Status/ Tier |
|
1 |
Mixed Use |
1.613
|
20% at 22/ha |
ü |
! |
ü |
ü |
ü |
! |
ü |
û |
ü |
N/A |
|
1 |
|
2 |
New Residential |
0.527 |
22 units /ha |
ü |
ü |
ü |
ü |
ü |
! |
ü |
û |
û |
N/A |
|
1 |
|
3 |
Serviced Sites |
0.965 |
10 units /ha |
ü |
ü |
ü |
ü |
ü |
! |
ü |
û |
û |
N/A |
|
1 |
|
4 |
New Residential |
1.25 |
22 units/ha |
ü |
ü |
ü |
ü |
ü |
! |
ü |
û |
ü |
N/A |
Extant permission for 15 units 07/601 and 13/7045 |
1 |
|