Chapter 2 - Planning Report and Drawings

Dúnta27 M.F., 2023, 9:00am - 9 Sam, 2023, 4:00pm

The relevant documentation can be found in the materials section in the side bar.

 

1. Landscaping Drawings

2. Part 8 Planning Report

3. Planning Drawings

4. Site Location

5. Visualisations

 

Toucan crossing - St Nessan Road and Fr Russell Road
With respect of the Toucan crossing proposed on Fr Russell road and St Nessan Road, it is not clear if this is to contain signalised beeping system to assist visually impaired in crossing the...
Limerick Cycling Campaign Submission - Part 8 - St. Paul's Roundabout to Ballykeeffe Roundabout Active Travel Scheme
Please find attached the submission from Limerick Cycling Campaign on the Part 8 - St. Paul's Roundabout to Ballykeeffe Roundabout Active Travel Scheme.
Significant departure from desire lines for cyclists at St.Paul's roundabout
I wish to raise an observation about the significant departure from the desire line for cyclists traveling inbound on St.Nessans road at St.Paul's roundabout. Cyclists are expected to...
Objection to the entire development
See attached document
Use of Toucan crossings at roundabouts
Cyclists going towards the SCR from Dooradoyle Rd need to use 4 signalised crossings in order to pass through the Ballykeefe Roundabout if they want to stay on the cycle paths. The delays this will...